News
Calgary Moves to Stage 2 Water Restrictions as City Continues Repair Work
Calgary residents can now utilize outdoor water use as the city transitions to Stage 2 water restrictions following the latest announcement. This shift enables residents to attend to their gardens with more flexibility, showing progress amid ongoing repairs.
The move to Stage 2 came as a result of activating another pump at the Bearspaw water treatment facility, positively impacting the water flow post the repaired feeder main incident. Mayor Jyoti Gondek assured the public on the stability post-repairs, with easing restrictions reflecting restored confidence.
Michael Thompson, Calgary’s general manager of infrastructure services, outlined the allowances under Stage 2 restrictions: residents can use sprinklers, soaker hoses, or in-ground systems for up to an hour weekly. The schedule is organized by address numbers, emphasizing even and odd numbers on different days.
Thompson recommended using the allotted hour during cooler morning or evening hours for optimal water absorption by plants. Specifically, even-numbered houses can water on Wednesdays or Saturdays, while odd-numbered houses can do so on Thursdays or Sundays.
Residents can also water gardens, shrubs, and plants with a hose fitted with a trigger spray nozzle at any time, enhancing the ability to maintain green spaces despite previous constraints. The city is closely monitoring the situation to ensure that the water supply aligns with the increased demand post the transition to Stage 2.
Gondek acknowledged the relentless efforts of city crews and the cooperation of residents in adapting to the water restrictions. She expressed relief at the forward progress and emphasized the collective effort involved in reaching this point.
While celebrating the favorable developments, Gondek indicated ongoing reviews and future infrastructure management plans to safeguard against similar incidents. The transition towards Stage 1 water restrictions in the near future remains possible as repair work continues.